Wetroom – shower only

  • Location: Ashton under Lyne
  • Installed in: 2013
  • Timescale: 2 weeks

Details:

Just two weeks to remove a tired 3 piece bathroom suite and replace with a state of the art wetroom. The old room was home to a hot water cylinder which was taking up much needed space, within the two week timeframe we also removed the cylinder and placed and un-vented alternative into the loft space. The new system offers greater hot water pressure ideal for the rainhead Grohe shower system. The finished result is a room that is stylish and functional.