Shower room

  • Location: Bramhall
  • Installed in: 2013
  • Timescale: 1 week and 2 days

Details:

The existing shower room had very limited showering space as it had the basin and the shower within what is now the shower area. We moved the basin to the other wall using an ideal standard space range basin, this enabled us to fit a low profile, oversized shower tray. All completed within 7 working days, our customer was delighted with the results.